Difference between revisions of "Co-Lab todo list"

From QC Co-Lab
Jump to navigation Jump to search
 
Line 4: Line 4:
  
 
Things to have done:
 
Things to have done:
 
*finish/polish floor
 
  
 
*replace ceiling tiles and insulation
 
*replace ceiling tiles and insulation
Line 27: Line 25:
 
== Computer admin ==
 
== Computer admin ==
  
* install XP on machine for David Hinkle's dad
 
* eMachines p4 on test stand needs a power supply
 
* second ubuntu box (dexter) has no left click?
 
* no linux drivers for Dell A960 printer at front desk - install windows?
 
* need windows machine or hacked driver for door control software
 
 
* per member cluster logins - ldap/kerberos/radius?
 
* per member cluster logins - ldap/kerberos/radius?
* network wiring
+
* network wiring for studio, middle room, classroom (terminate), anywhere else?
* server recovery not working? need pci-e/x video card to verify
 
  
  

Latest revision as of 13:08, 31 October 2011

Physical Space

Add to this list as needed, put a name and date after each item if you've completed it.

Things to have done:

  • replace ceiling tiles and insulation
    • Have we fixed the leaks yet?
  • hang doors ^Main door hung, need door for kitchen and curtains for other doors. -Mark
  • carpet/tile transitions -
  • Work on Asset/Inventory Control
    • Ben Z has a google doc listing major items with tags. Feel free to use the label maker to label your own stuff.

Digital Presence

  • We need better copy on the home page
  • Add pages to the wiki-- anything that's red-linked needs info, people!
  • Create sign up forms (Google Docs?)
  • Manage the social media channels. Ideally, each should have its own unique content.


Computer admin

  • per member cluster logins - ldap/kerberos/radius?
  • network wiring for studio, middle room, classroom (terminate), anywhere else?


Purchases

Please see Co-lab Wish List